ENGINE · DOCUMENT COMPARE

Every discrepancy. Every overbilling, found.

Upload any two procurement documents — PO vs Invoice, Quote vs PO, Contract vs Change Order — and Trueleveler finds every price difference, every unauthorized charge, and every line that was never in scope.

60s
Avg Analysis Time
34%
Invoices With Errors
6
Outputs Per Analysis
$0
To Try · No Card
§ 01 THE PROBLEM · INVOICE OVERBILLING IS THE MOST COMMON LOSS

Rate drift hides in plain sight.

200+ invoices per project

The average commercial construction project receives 200+ invoices across dozens of vendors. Manually checking each one against the PO takes 5–15 minutes per document — hours every week, most of which never gets done.

Rate drift goes uncaught until closeout

Unit rates slowly creep up across sequential invoices from the same vendor. Most teams don't notice until the project closes and the final account reconciliation surfaces the cumulative exposure — too late to dispute.

Unauthorized charges slip through

Site supervision fees, delivery charges, small-tool allowances — line items that appear on the invoice but were never in the original PO. Your AP clerk approves them by default because nobody has time to cross-reference.

Disputes without documentation

Even when you spot an error, putting together a dispute-ready report means screenshotting POs, highlighting invoice lines, and formatting a delta table by hand. Many teams skip it and just pay.

§ 02 WHAT YOU GET · SIX OUTPUTS, EVERY ANALYSIS

Six outputs. Every analysis.

Variance

Price variance report

Every line item where the invoiced rate differs from the PO, with absolute and percentage delta. Sorted by exposure, largest first.

Unauthorized

Unauthorized charges log

Items on the invoice with no corresponding PO line — flagged for approval or rejection before you sign the check.

Missing

Missing items register

Items in the PO that don't appear in the invoice — potential short delivery, omission, or billing dispute in your favor.

Drift

Unit rate drift tracker

Tracks rate changes across multiple invoices from the same vendor over the project lifecycle. Creeping increases surfaced before closeout.

Exposure

Overbilling summary

Total exposure: combined value of all variances and unauthorized charges. Know your number before you sign the check.

Dispute

Dispute-ready report

Formatted PDF with every discrepancy, document references, and delta values — ready to send back to the vendor or subcontractor.

§ 03 HOW IT WORKS · UPLOAD TO RESULTS IN SECONDS

Upload to results in seconds.

01

Upload two documents

PO and Invoice, Quote and PO, Contract and Change Order — or any two versions of the same procurement document. PDF, Excel, or Word.

02

AI cross-references every line

Trueleveler extracts all line items from both documents and maps them against each other, regardless of format differences or column order.

03

Review flagged items

Interactive table showing matches, variances, missing items, and unauthorized charges — with a confidence score on each finding.

04

Export or dispute

One-click dispute-ready PDF for your vendor, or export to Excel for your accounts team or project controller.

§ 04 THE IMPACT · WHAT DOC COMPARE CATCHES BEFORE PAYMENT

Money stopped at the door.

34% of invoices

Contain at least one pricing error or unauthorized charge, based on CFMA Financial Benchmarker data and AP audits of commercial construction projects.

200 invoices in 60s

What used to take a full week of PO cross-referencing runs in under a minute. Your AP clerk gets the variance report today, not next month.

Zero rate drift

Every creeping unit rate increase surfaced across sequential invoices. Catch drift in real time instead of at closeout reconciliation.

§ 05 USE CASES · BUILT FOR HOW CONSTRUCTION PROCUREMENT WORKS

Every invoice. Every version.

PO vs invoice verification Quote vs awarded contract check Change order vs scope validation Materials delivery vs purchase order Subcontractor pay app review Interim payment application audit Schedule of values (SOV) reconciliation Retainage release verification Final account review Owner's Rep invoice audit
§ 06 FAQ · QUESTIONS AP AND PMS ASK

Questions controllers ask us.

Any two procurement documents — PO vs Invoice, Quote vs PO, Contract vs Change Order, or two versions of the same document. Trueleveler reads PDF, Excel, and Word as-is. No template required.
The AI extracts every line item from both documents and maps them against each other regardless of column order, description wording, or structural differences. It flags matches, variances, missing items, and charges that appear on one side with no corresponding entry on the other.
Price variances between PO and invoice, unauthorized charges not covered in the original PO, missing items you paid for but never received, unit rate drift across multiple invoices from the same vendor, and a total overbilling exposure number. Every finding comes with a confidence score.
Yes. Every analysis produces a formatted, dispute-ready PDF with every discrepancy, document references, and delta values — ready to send back to the vendor or subcontractor. You can also export to Excel for your accounts team or project controller.
Documents are processed in memory and never stored on our servers. Your data is never used to train AI models. Trueleveler is GDPR and CCPA compliant with SOC 2 practices in place. See our Security page for details.
§ 07 ALSO TRY · THE FULL PROCUREMENT STACK

The full procurement stack.

START FREE · NO CREDIT CARD

Check your next invoice — free.

Upload your own PO and invoice and get a full AI variance analysis within minutes. No credit card, no templates.