Coverage
Coverage percentage
A single number showing what percentage of spec requirements are addressed in the bid — a gauge of bid completeness at a glance.
Line-By-Line
Line-by-line comparison
Every spec requirement mapped against the corresponding bid response. See exactly which items are covered, partially addressed, or missing entirely.
Gap Severity
Critical gap detection
Gaps ranked by severity — high, medium, low — based on cost exposure, schedule impact, and likelihood of change order. Focus on what matters first.
Pricing
Pricing variance analysis
Extracts pricing from the bid and flags line items significantly above or below expected ranges, highlighting potential bid errors or buy-outs.
Exclusions
Exclusion tracking
Exclusions, qualifications, and carve-outs found in the bid are listed and cross-referenced against spec requirements, for you to confirm before buyout.
Subs
Substitution flagging
Proposed alternates and material substitutions extracted and compared against specified products, with notes on whether engineer approval is required.