Bid comparison across 20+ subcontractors
Every trade package has different inclusions, exclusions, retainage terms, and payment schedules. Manually normalizing five bids per trade across a dozen packages is a week of estimator time you don't have.
Trueleveler is the AI-supported project operations platform that does the paperwork for general contractors. You manage 20+ subcontractors per project, thousands of line items, and millions in contract value. Trueleveler levels your bids, drafts your RFQs and RFIs, reviews change orders and pay apps, and writes your daily logs and meeting minutes across 28 AI engines.
Try it now
Drop 2–5 vendor quotes and see them leveled, usually in under a minute, with no signup. You get the totals and flag counts; the full report is emailed only if you ask for it.

Every trade package has different inclusions, exclusions, retainage terms, and payment schedules. Manually normalizing five bids per trade across a dozen packages is a week of estimator time you don't have.
When the subcontract language is vague or the scope of work doesn't match the bid, change orders multiply. By the time you catch it, the project is already over budget and the owner is asking questions.
Subs submit pay apps with inflated percent-complete figures, front-loaded schedules of values, or billing for stored materials that haven't arrived. Catching overbilling across 15 active subs requires line-by-line review.
You're signing dozens of subcontracts per project. A missed flow-down clause, a non-standard indemnification, or a waived notice period in one contract can expose you to six-figure liability across the entire job.
Upload up to 10 vendor quotes per trade. AI normalizes inclusions, exclusions, retainage, and payment terms to reveal which bid actually costs less — not just which headline number is lowest.
AI reads every subcontract and flags indemnification gaps, missing flow-down clauses, non-standard notice periods, and liability exposure — before you sign. Works with AIA, ConsensusDocs, and custom forms. When one of those clauses actually triggers — a differing site condition, an owner-directed change, a payment dispute — Notice Builder drafts the serve-ready notice itself, citing the exact clause and calculating the deadline it sets.
Upload a pay application and the original schedule of values. AI checks percent-complete figures against prior billing, flags front-loading, and catches overbilling on stored materials. Subs running their own Trueleveler account are recognized as subcontractor-type orgs, so a change order or pay app they draft comes with a one-click “Send to GC” straight into your project instead of an email attachment.
When a PM moves to a new project, generate a structured handoff summary covering open RFIs, pending change orders, contract obligations, and critical upcoming deadlines — in minutes, not days.
Paint progress zones on any sheet for quantity-weighted percent complete, link a zone to a schedule activity or SOV line, and one-click pull it into the schedule or the pay app when you're ready to bill; pin photos on the plan and turn them into RFIs, punch, tasks, or safety records, and take drawings offline for the parts of the site with no signal — from the iPhone app or the web.
Send the architect an RFI respond link with viewed-tracking, reminders, and revoke; give the owner a live read-only schedule link; invite subs to bid through tracked ITB links. None of them needs an account, and none consumes a seat.
Most bid tabs level in under a minute, so the comparison is ready before the bid meeting, not after.
Bids for each trade are leveled on one sheet before award, so an overpriced or incomplete bid shows while you can still act.
Notice windows and cure periods caught automatically across every subcontract reviewed
Upload your own bid documents and get a full AI analysis within minutes. No credit card, no templates required.