ENGINE · PM HANDOFF REPORT

Never lose project context. In a PM transition.

Trueleveler compiles contract risks, scope gaps, open change orders, pending submittals, key contacts, and budget status into a structured handoff brief — so the incoming PM starts with full situational awareness, not a blank slate.

60s
Avg Analysis Time
67%
Of Projects See A Transition
6
Outputs Per Analysis
$0
To Try · No Card
§ 01 THE PROBLEM · CRITICAL KNOWLEDGE WALKS OUT THE DOOR

When a PM leaves, the project loses a year.

Open items buried in email threads

The outgoing PM knows every pending RFI, every submittal in rework, every owner conversation still open. The incoming PM gets a ZIP of old emails and a 45-minute phone call. The rest has to be reconstructed in the first 60 days.

Contract risks nobody flagged

Notice windows, liquidated damages, pay-when-paid language, retainage ratchets — the outgoing PM had them mentally tracked. Miss a notice window in the first week, and the claim is gone before the new PM even unpacks.

Budget variance with no story behind it

A cost report shows -$420k to budget. Was that a known scope add? An unrecovered CO? A coding error? Without the narrative, the incoming PM either over-corrects or inherits a surprise at the next owner meeting.

3x more likely to blow budget

Projects with unstructured handoffs are 3x more likely to exceed budget due to missed risks, lapsed deadlines, and duplicated work. The cost of a bad handoff shows up 90 days later — and it's never small.

§ 02 WHAT YOU GET · SIX OUTPUTS, EVERY HANDOFF

Six outputs. Every handoff.

Contract

Contract risk summary

High-risk clauses, notice windows, payment terms, liability exposure — everything the incoming PM needs to know about the contract before making any decisions.

Scope

Scope gap analysis

Missing items, unauthorized extras, compliance status from prior scope checks — a clear picture of what was supposed to be in scope versus what actually is.

Open

Open items register

Pending change orders, outstanding submittals, unresolved RFIs — every open item compiled into a single actionable register with status, age, and next steps.

Budget

Budget & schedule snapshot

Cost to date, projected final cost, critical milestones, and delivery timeline — the financial and schedule picture at a glance with variance callouts.

Contacts

Contacts & access

Owner reps, architect, consultants, key trades, and system access. Who to call for what, with escalation paths and political context flagged where relevant.

Export

Branded handoff PDF

One-click export as a branded PDF or shareable link. Editable before release so the outgoing PM can layer institutional knowledge on top of the AI-drafted brief.

§ 03 HOW IT WORKS · UPLOAD TO HANDOFF-READY IN SECONDS

Upload to brief in seconds.

01

Upload project docs

Contract, CO log, submittal log, RFI log, budget reports, and any prior Trueleveler analysis results. PDF, Word, Excel — any format.

02

AI synthesizes

Trueleveler reads every document, cross-references risks, open items, budget data, and schedule status into a single structured handoff report.

03

Outgoing PM edits

Every section is editable. Add institutional knowledge, flag political context, note owner preferences before sharing with the incoming PM.

04

Share with incoming PM

Export as branded PDF or share a live link. Incoming PM reads a consolidated brief in 15 minutes, not a week of email archaeology.

§ 04 THE IMPACT · WHAT A STRUCTURED HANDOFF PREVENTS

Continuity that holds.

3x budget risk

Projects with unstructured handoffs are 3x more likely to exceed budget. Missed notice windows, duplicated work, and unflagged risks compound — a structured handoff is the cheapest insurance policy on a project transition.

Brief in 60s

What used to take an outgoing PM two days to assemble (and still leave gaps) now takes under a minute, plus edits. The incoming PM reads the brief in 15 minutes instead of losing a week to discovery.

Zero blank slate

Every risk, open item, key contact, and budget variance is in one document — with the narrative intact. The incoming PM starts day one with the full picture, not a stack of folders and a guess.

§ 05 USE CASES · BUILT FOR HOW PM TRANSITIONS ACTUALLY HAPPEN

Every transition. Every handoff.

Outgoing-to-incoming PM handoff PM leave-of-absence coverage Mid-project leadership change Owner-side PM transitions Executive briefing packages Legal & claims file prep Portfolio PM rotation CM/Owner's rep onboarding Joint-venture partner briefings Acquisition & due-diligence reviews
§ 06 FAQ · QUESTIONS PMs ASK

Questions PMs ask us.

Upload the contract, change orders, submittal log, RFI log, budget reports, and any prior Trueleveler analysis results. PDF, Word, Excel, or photos all work. The more context you feed in, the richer the handoff brief — but even a contract plus a CO log produces a solid starting report.
A structured handoff brief is generated in under 60 seconds from the moment the last document uploads. The incoming PM reads a consolidated brief in 15 minutes instead of spending their first week reconstructing context from scattered sources.
Yes. Every section is editable. The outgoing PM can add institutional knowledge, flag political context, note owner preferences, and correct any AI interpretation before sharing with the incoming PM or handing it to leadership.
Yes. The free plan gives you access to the Procurement Tracker at no cost with no credit card. To run PM Handoff and the other 24 AI engines, Pro is $199/mo with 100 runs, and Business is $499/mo with 300 runs and API access. See full pricing.
Documents are processed in memory and never stored on our servers. Your data is never used to train AI models. Trueleveler is GDPR and CCPA compliant with SOC 2 practices in place. See our Security page for details.
§ 07 ALSO TRY · THE FULL PM STACK

The full PM stack.

START FREE · NO CREDIT CARD

Hand off your next project cleanly — free.

Upload your own project docs and get a full AI-drafted handoff brief in minutes. No credit card, no templates, no lock-in.