Upload spec sections and AI scans every CSI division, identifies all submittal requirements, and builds a complete, sortable register — catching items buried in specs that manual review misses.
| CSI Section | Description | Type | Priority |
|---|---|---|---|
| 03 30 00 | Cast-in-place concrete mix design | PRODUCT DATA | PRE-CON |
| 05 12 00 | Structural steel shop drawings | SHOP DRAWING | PRE-CON |
| 09 91 00 | Paint color samples and finish schedule | SAMPLE | PRE-INSTALL |
| 23 05 00 | HVAC commissioning test reports | TEST REPORT | CLOSEOUT |
Submittal requirements are scattered across hundreds of pages of project specifications, buried in different CSI divisions with inconsistent formatting. A PE manually combing through specs might spend 20+ hours building a submittal register and still miss items in obscure divisions. Missed submittals surface weeks later as RFIs, procurement delays, or failed inspections. Trueleveler scans every page, every division, and extracts every requirement into a structured, sortable register — in minutes.
Submittal Extractor is included in every paid plan — along with all 9 AI engines, the Procurement Tracker, and Vendor Database.
Upload your spec sections, get a complete sortable register with every requirement extracted.
No credit card, no templates.