1. Home
  2. Help
  3. Engines
  4. PO vs Quote
Post-Award · Engine

PO vs Quote

PO vs Quote is the engine that compares a purchase order against the original vendor quote, item by item. It reports every price change, quantity change, added item and removed item along with the total variance, so you catch pricing drift before the PO is released or paid.

Updated

Engine Phase: Billing Runtime: 25-45 seconds Pro+

What does PO vs Quote do?

PO vs Quote lines up the two documents item-by-item and reports every difference: price delta per line, quantity changes, added items, removed items, and total variance. It's an audit step before the PO is released — or before it's paid.

When should I use PO vs Quote?

Use PO vs Quote when a PO is ready to issue and you want to verify it matches the quote you accepted, when you receive a PO from a GC and want to confirm it matches your quote, or for a monthly spot-check of PO and quote pairs.

What do I upload to PO vs Quote?

Upload the vendor quote and the purchase order, each as a PDF, DOCX or XLSX file.

How do I run PO vs Quote?

To run PO vs Quote, open it, upload both documents, run the analysis, read the verdict and review the diff table.

  1. Open the engine

    Sidebar → Engines → PO vs Quote.

  2. Upload both documents

    Label each slot. Quote goes on one side, PO on the other.

  3. Run

    25–45 seconds.

  4. Read the verdict

    Top: total variance + per-line diff count.

  5. Review the diff table

    Line items side by side. Highlighted cells = changed values.

How do I read the PO vs Quote results?

The result shows a variance banner, a diff table, the added and removed items and a narrative.

Variance banner

Total $ and % variance between quote and PO.

Diff table

One row per line item. Quote column + PO column + delta column. Green = reduction, red = increase.

Added items

On the PO but not on the quote.

Removed items

On the quote but not on the PO.

Narrative

Plain-language summary of the most significant differences.

Every control, explained

Run analysis

One run.

Filter: Changed only / Added / Removed / All

Narrows the diff table.

Export PDF

Audit report.

Export XLSX

Side-by-side diff with columns preserved.

Chains

Chains into

Dispute as Change Order? — Found discrepancies? Check if it qualifies as a disputed change order.
Check the Underlying Contract — Review the contract behind this PO for risk clauses.

Chained from

Compare PO vs Invoices — During construction — verify invoices match the contract and PO terms.
Compare Related Invoices — Verify the invoices related to this change order match the approved amounts.

Exports

Troubleshooting

Engine reports items as added that were actually in the quote

Vendor described them differently in the PO vs the quote. Use chat to re-evaluate specific pairs.

Totals disagree but line items don't

Check for freight, tax, or discount lines — they're often rolled up on one document and broken out on the other.