Meeting audio. Structured minutes. Every line scrubs.

Records live or accepts uploaded audio of any meeting, performs ASR via Gemini 2.5 Flash, runs speaker diarization, then extracts a structured minutes document. Attendees with talk-time share, topic-grouped summary, action items with assignee + due, decisions with rationale, risks with severity — every line carries an audio anchor (▶ MM:SS) that scrubs the recording to the exact moment. Action items auto-promote to the Tasks tracker.

30–90s
per hour of audio
▶ anchor
per line
Auto
action → Tasks
18 mo
audio retention
01 · What it does

The meeting happened. Now it's documented.

Construction meetings produce decisions that bind. The OAC meeting confirms the chiller substitution. The pre-installation meeting locks the framing sequence. The owner walkthrough records 14 items that became RFIs. None of it survives unless someone writes minutes — which usually means someone listening less than they should, transcribing rough notes, and emailing a summary nobody reads twice.

Voice Synthesis replaces that workflow. Record the meeting (mobile or desk), or upload audio after. The engine transcribes with speaker diarization (knows who said what), then composes structured minutes: attendees with talk-time share, topic-grouped narrative, action items with assignee and due date, decisions with rationale, risks with severity. Every output line carries a ▶ MM:SS audio anchor — click it, the recording scrubs to the exact moment.

02 · When to run it

Any meeting that produces decisions or actions.

The engine handles construction-domain audio — site noise, multiple speakers, technical vocabulary — better than generic transcription tools. Built for the meetings construction actually runs:

03 · What you upload

Audio. That's the only required input.

Live recording (mobile or web) or uploaded audio file. Context inputs improve accuracy but aren't required.

Required

Audio recording

Live capture or upload. Common formats accepted: M4A, MP3, WAV, OGG. Up to 4 hours per file. Mobile mic, desk mic, or conference room speakerphone all work.

Optional · accuracy boost

Project context

Project name + attendee list + recent meetings. The engine uses this to tune diarization (knows which speaker is the architect vs the GC PM) and to disambiguate terms (knows "Carrier" is the chiller manufacturer in this project).

Optional · cross-link

Open project state

Open RFI / submittal / procurement state lets the engine cross-link mentions in the meeting to existing trackers. "Did the chiller submittal come back?" auto-links to SUB-0247 instead of becoming a vague reference.

04 · What you get back

Transcript on the left. Structured outputs on the right.

The minutes render with audio anchors per line. Click ▶ on any output and the recording scrubs to that moment. Below: a sample synthesis from a 47-minute OAC meeting.

00:00METAOAC #14 · Mercer Lab Building · 5/22/2026 · 47 min · 6 attendees diarized. Talk-time: PM 41% / Architect 22% / Owner 18% / MEP eng 11% / GC super 6% / Commissioning 2%. Synthesized
▶ 04:12DECISIONChiller substitution approved · Carrier 30XA-302 in lieu of specified Trane RTAF. Substitution log SUB-0089 referenced. Cost-neutral; lead-time 22 wks vs 28. CO-007
▶ 11:30ACTIONResequence Floor 4 framing · Assignee: GC super (Jay). Due: 5/30. Move corner unit framing to week of 6/8 to allow window install. → Tasks
▶ 18:47RFIStair landing dimension clarification · Architect to issue clarification by 5/26. Field has 3'-2" vs spec 3'-6". → RFI Tracker
▶ 22:05RISKSwitchgear lead time at 32 wks · Severity: high. PO release deadline 6/15 or schedule slips 2 wks. Owner aware. High
▶ 35:18ACTIONSubmit pay app PA-06 by 5/27 · Assignee: PM (Sasha). With G702/G703 + COI updates. → Tasks
▶ 42:50COOwner-directed scope change — lobby finish · Marble → porcelain. PM to issue CO request by 5/28. → CO Review
ΣSUMMARY4 decisions · 7 actions (3 routed to Tasks) · 2 RFIs queued · 1 CO drafted · 1 high-severity risk. Audio retained 18 mo. Minutes auto-emailed to attendees. Done
Why audio anchors matter

Two weeks later when the sub disputes "you said we'd resequence the framing," the PM clicks ▶ 11:30 and plays the actual decision back. Six months later when the owner asks why the chiller is Carrier not Trane, the audio anchor surfaces the OAC decision. Source-of-truth that doesn't require trusting anyone's memory.

05 · How it chains

Audio in. Three trackers out.

Voice Synthesis is built to be the multi-tracker entry point. Field meetings produce actions and decisions for several trackers at once — the engine extracts and routes each into the right place.

06 · FAQ

Things everyone asks first.

How accurate is the transcription with site noise?

Gemini 2.5 Flash handles typical construction trailer / conference room audio at >95% word accuracy. Active site audio (generators, hammer drills) drops to ~85% on the noise side — meeting content typically stays clear because mics are pointed at speakers. Domain vocabulary (RTU, AHU, VAV, AIA G702) is correctly transcribed by default; the engine doesn't need a glossary.

How does speaker diarization know who's who?

If you supply an attendee list with project context, the engine matches voice profiles across recordings (the architect on this project always says certain phrases, has a certain cadence). First meeting: speakers labeled as Speaker 1 / 2 / 3 with the option to tag once. Subsequent meetings auto-recognize. Accuracy improves with project meeting count.

What about confidential discussions (legal, personnel)?

Recordings are stored encrypted at rest, scoped to the project's authorized users. PII detection flags personal data for review before exporting. Off-the-record portions can be marked at recording time (pause + resume) so they don't synthesize into the minutes. Audio retention defaults to 18 months; configurable to 1–7 years per project.

What if I forget to record live — can I upload later?

Yes. Upload any audio file (recorded on a phone voice memo, dictated post-meeting, etc.) and the engine processes it the same way. Live mode just saves you the step of uploading after.

Can the synthesis route to Tasks automatically?

Action items with a clear assignee + due date auto-promote to the Tasks tracker (source = meeting). Ambiguous actions ("someone needs to check the panel") stay in the meeting summary for PM review. The PM can promote any line to Tasks with one tap. Default behavior favors auto-promotion to avoid actions getting lost.

Record a real meeting. See the minutes in 90 seconds.

Bring a 30-minute OAC or pre-installation recording to a 15-minute call. We'll process it on screen and walk through every action, decision, and RFI extracted. You keep the minutes and the audio.

Start free — 14 days, no card →