Tracking · Procurement

Every long-lead item, tracked end to end.

From bid award to job-site delivery. ROJ dates, vendor health, fabrication status, COI compliance — one watchlist that updates itself from every PO, submittal, and shipment.

7
stages tracked per item
ROJ
required-on-job math
Auto
PO drift detection
Schedule Risk integration
01 · The stage chain

Bid → PO → Submittal → Fab → On-site → Installed.

Every procurement item walks a strict seven-stage chain. The current stage updates automatically from upstream signals: a PO issuance walks the row from Bid to PO. An approved submittal walks it to Fab. A delivery scan walks it to On-site.

Float days (forecast delivery minus ROJ) is the magic number. Negative float surfaces in red, pings Schedule Risk, and triggers an Expedite suggestion.

02 · Row actions

New PO. Issue PO. Expedite. Substitute.

New PO

Auto-prefilled drafter

Opens the PO Generator with item data, awarded bid, and vendor pre-filled.

Issue PO

Send to vendor

DocuSign / email / print. PO vs Quote auto-runs in the background.

Expedite

Email composer

Opens an email preloaded with the ROJ and current forecast delivery. Vendor gets the urgency, you don't write it.

Substitute

Substitution Recommender

Opens the substitution engine if the current vendor can't meet ROJ. Equivalent products surfaced.

03 · What feeds it

Engines write here · humans work here.

★ · Pairs with

It works alone. It's better in a chain.

Most engines work standalone, but they're better when their output feeds the next engine. This one pairs especially well with:

Drop the bid. The rest writes itself.

Bring 3 quotes to a 15-minute call. We level them on screen. You keep the output.