TRACKER · SUBMITTAL TRACKER

Track every submittal. From spec to approval.

Manage the full submittal lifecycle: prepared, submitted, under review, approved, approved-as-noted, revise-and-resubmit, rejected. Every revision timestamped, every document preserved. Import from the Submittal Extractor or manually — your log starts day one, not week four.

Real-time
Continuous Tracking
7
Lifecycle Stages
6
Outputs Per Project
$0
To Try · No Card
Trueleveler submittal register: spec sections, subcontractors, ball-in-court with days waiting, review states, and due dates with an overdue flag
Submittal register · review log · sample data
§ 01 THE PROBLEM · SUBMITTAL LOGS FALL BEHIND BY WEEK TWO

Submittals pile up. The log falls behind.

Submittals tracked in spreadsheets that nobody updates

The Excel log starts clean on day one. By week three, half the entries are missing revision dates, review statuses are wrong, and nobody knows which submittals are actually overdue.

Missed review deadlines that delay procurement

A submittal sits "under review" for six weeks because nobody flagged the deadline. By the time it's approved, the lead time pushes delivery past the install date.

Revision history lost across email threads

Rev A was rejected. Rev B was approved-as-noted. Rev C is... somewhere in someone's inbox. When the architect asks for the review log, it takes a day to reconstruct.

No connection between spec requirements and actual submissions

The spec calls for 47 submittals. The log has 31. Which 16 are missing? Without a requirement-to-submission map, nobody knows until closeout.

§ 02 WHAT YOU GET · SIX OUTPUTS, EVERY PROJECT

Six outputs. Every project.

Lifecycle

Full lifecycle tracking

Every submittal tracked through 7 stages with timestamps, responsible parties, and automatic status progression.

Review Log

Review log

Complete revision history with reviewer comments, action items, and document versions — audit-ready for closeout.

Alerts

Overdue alerts

Automatic flagging when submittals exceed review deadlines, with escalation notifications by days overdue.

Transmittal

Transmittal generator

One-click transmittal creation with cover sheet, attached submittals, and distribution list.

Compliance

Compliance matrix

Spec requirements mapped to actual submissions — shows exactly which submittals are missing, pending, or complete.

Collaborate

Assignees, threads, notifications

Every submittal takes an owner from your roster — assignment lands in their in-app bell and a batched email. Comment threads with @mentions keep the review conversation on the record, and the Mine filter shows each reviewer only their court.

§ 03 HOW IT WORKS · IMPORT TO CLOSEOUT IN MINUTES

Import to closeout in minutes.

01

Import or create

Import from Submittal Extractor, upload an Excel log, or create entries manually. Your register is ready in minutes.

02

Track status

Update each submittal through the 7-stage lifecycle. Automated alerts fire when deadlines approach or pass.

03

Review and revise

Attach review comments, route revisions, and maintain the full history without losing any documents.

04

Close out clean

Export the complete review log and compliance matrix for project closeout and owner turnover.

§ 04 THE IMPACT · WHAT TRACKING CATCHES BEFORE CLOSEOUT

Time saved. Deadlines kept.

47 submittals

Average number of submittals per spec section on a mid-size commercial project. Tracking them manually takes 4-6 hours per week.

Zero missed deadlines

Automatic overdue alerts mean no submittal sits "under review" for six weeks without someone knowing about it.

Day-one log

Import from Submittal Extractor and your register is populated before the first OAC meeting — not reconstructed at closeout.

§ 05 USE CASES · BUILT FOR HOW CONSTRUCTION SUBMITTALS WORK

Every submittal. Every project.

Commercial construction submittals Design-Build submittal management Sub-consultant coordination Closeout document tracking Owner-required submittal logs Spec compliance verification
§ 06 FAQ · QUESTIONS PROJECT TEAMS ASK

Questions project teams ask us.

Yes. Submittal Extractor scans your spec sections and builds the register. One click imports it into Submittal Tracker with all requirements, review types, and CSI divisions pre-populated.
Seven stages: Prepared, Submitted, Under Review, Approved, Approved as Noted, Revise and Resubmit, and Rejected. Each transition is timestamped with the responsible party.
Yes. Export to Excel or PDF for sub-consultant coordination, OAC meeting packages, or closeout documentation.
Set review deadlines per submittal or use project-wide defaults. When a submittal exceeds its deadline, the tracker flags it with days overdue and alerts the assigned owner through the in-app notification bell and a batched email digest — so the person whose court it's in actually hears about it.
Documents you submit for analysis are processed in memory and are not retained, and your data is never used to train AI models. Files you choose to save to your workspace stay in your private, encrypted storage, and document retention for cross-document search is off by default. Trueleveler is GDPR and CCPA compliant. SOC 2 certification is on the roadmap. See our Security page for details.
§ 07 ALSO TRY · THE FULL SUBMITTAL STACK

The full submittal stack.

START FREE · NO CREDIT CARD

Start tracking submittals today — free.

Import your spec requirements and start tracking in minutes. No credit card, no templates, no lock-in.